TM 1-4920-438-13&P
OPERATOR INSTRUCTIONS
POWER TRAIN SHOP
POSITIONING SHELTER BASIC ISSUE ITEMS (BII) BOX FOR OPERATIONAL MODE
INITIAL SETUP:
References
Materials/Parts
General Mechanics Tool Kit
Equipment Condition
Personnel Required
Functional
CMF 15 Series (2)
Figure 1.
Unsecure Shelter BII Box.
1.
Figure 3, Item 8) and store in secure storage location.
2.
Position shelter BII box in preferred location.
3.
Remove one ring bolt (Figure 1, Item 1) from transport location and store in shelter BII box (WP 0002 00,
4.
Item 8 and WP 0002 00, Figure 3, Item 8) and install into empty loor insert.
END OF WORK PACKAGE
0010 00-1/2 blank