TM 1-4920-438-13&P
OPERATOR INSTRUCTIONS
POWER TRAIN SHOP
CHECKING SHELTER LEVEL
INITIAL SETUP:
Equipment Condition
Personnel Required
Functional
CMF 15 Series (2)
References
CHECKING SHELTER LEVEL
After all equipment has been placed in the suggested operational positions, recheck leveling of shelter. See
WP 0005 00, SITING, to verify and adjust shelter level. Correct leveling adjustments are essential to ensure
proper operation of equipment, tools, doors, and access panels.
The shop is now operational.
END OF WORK PACKAGE
0020 00-1/2 blank