TM 1-4920-440-13&P
OPERATOR INSTRUCTIONS
PRODUCTION/QUALITY CONTROL SHOP
POSITIONING SHELTER BASIC ISSUE ITEMS (BII) BOX FOR OPERATIONAL MODE
INITIAL SETUP:
References
Tools and Special Tools
General Mechanics Tool Kit
Equipment Condition
Personnel Required
Functional
CMF 15 Series (2)
POSITIONING SHELTER BII BOX FOR OPERATIONAL MODE
Figure 1.
Unsecure Shelter BII Box.
1.
Remove cargo strap (Figure 1, Item 3) securing shelter BII box (Figure 1, Item 2) and store in secure storage
location.
2.
Position shelter BII box (Figure 1, Item 2) in preferred location.
3.
Remove two ring bolts (Figure 1, Item 1) from transport location and store in shelter BII box (Figure 1, Item 2).
4.
Remove two setscrews (WP 0068 00, Figure 2, Item 18 or 19) from shelter BII box (Figure 1, Item 2) and
END OF WORK PACKAGE
0010 00-1/2 blank