TM 1-4920-440-13&P
0039 00
Table 1. Field Level Preventive Maintenance Checks and Services for PCQC Shop. - Continued
ITEM INTERVAL MAN- ITEM TO BE
PROCEDURE
EQUIPMENT
NO.
HOUR CHECKED OR
NOT READY/
SERVICED
AVAILABLE IF:
19
Monthly
Melamine
Ensure melamine board is free from major damage
Melamine board
Board
that would deem melamine board non-operational.
is not fully
operational.
Ensure melamine board is securely attached to
Melamine board
bookcase assembly.
is not secured
to bookcase
assembly.
Ensure melamine board mounting rivets are
Melamine board
securely attached and free from damage
mounting rivets are
damaged.
20
Monthly
Key Cabinet
Ensure key cabinet is fully operational and free
Key cabinet is not
from major damage that would deem key cabinet
fully operational.
non-operational.
Ensure key cabinet is securely attached to shelter
Key cabinet is not
wall.
secured to shelter
wall.
Ensure key cabinet mounting hardware is free
Key cabinet
from rust, cracks, breaks and rounded heads
mounting hardware
is damaged.
MANDATORY REPLACEMENT PARTS
END OF WORK PACKAGE
0039 00-5/6 blank