• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
'Microsoft Word - WP1' by ginda.roadruck - Page 68 of 338
'Microsoft Word - WP1' by ginda.roadruck - Page 70 of 338

Operator And Field Maintenance For Armament And Electrical Shop P/N 1024506
Page Navigation
  48    49    50    51    52  53  54    55    56    57    58  
img
. .
TM 1-4920-500-13&P
0008 00
ARMAMENT AND ELECTRICAL SHOP
OPERATION UNDER USUAL CONDITIONS
SAFEGUARDING BOLTS, WASHERS, AND NUTS
The following procedures are a recommended sequence for moving equipment. New positions in which
equipment may be located on expanded half of shelter are identified.
CAUTION
Ensure that proper bolts, washers, and nuts are available to secure equipment
when shop is to be transported. Incorrect hardware could cause extensive
damage to equipment or shelter when shop is moved. All bolts, washers, and
nuts removed from equipment will be collected and placed in cotton mailing bag.
Cotton mailing bag is stored in shelter BII box for safekeeping until equipment is
to be secured for transporting.
POSITIONING SHELTER BII BOX FOR OPERATIONAL MODE
Shelter
BII Box
SSAE037
1. Remove webbing strap from shelter BII box.
2. Position shelter BII box in preferred location.
3. Remove two ring bolts from shelter BII box transport location.
4. Store webbing strap in secure storage location and ring bolts in shelter BII box.
5. Obtain two setscrews from storage location and insert into empty ring bolt holes.
0008 00-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.