• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
'Microsoft Word - WP1' by ginda.roadruck - Page 69 of 338
'Microsoft Word - WP1' by ginda.roadruck - Page 71 of 338

Operator And Field Maintenance For Armament And Electrical Shop P/N 1024506
Page Navigation
  49    50    51    52    53  54  55    56    57    58    59  
img
.
TM 1-4920-500-13&P
0008 00
POSITIONING 60 AND 100 AMP CABLE REEL ASSEMBLIES FOR OPERATIONAL MODE
60 and 100 AMP
Cable Reel Assemblies
SSAE038
1. Remove cargo straps from 60 and 100 amp cable reel assemblies.
2. Position 60 and 100 amp cable reel assemblies in preferred location.
3. Remove two ring bolts from 60 and 100 amp cable reel assemblies transport location.
4. Store cargo straps in secure storage location and ring bolts in shelter BII box.
5. Obtain two setscrews from storage location and insert into empty ring bolt holes.
0008 00-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.