TM 1-4920-500-13&P
0008 00
POSITIONING 60 AND 100 AMP CABLE REEL ASSEMBLIES FOR OPERATIONAL MODE
60 and 100 AMP
Cable Reel Assemblies
SSAE038
1. Remove cargo straps from 60 and 100 amp cable reel assemblies.
2. Position 60 and 100 amp cable reel assemblies in preferred location.
3. Remove two ring bolts from 60 and 100 amp cable reel assemblies transport location.
4. Store cargo straps in secure storage location and ring bolts in shelter BII box.
5. Obtain two setscrews from storage location and insert into empty ring bolt holes.