• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
'Microsoft Word - WP1' by ginda.roadruck - Page 117 of 338
'Microsoft Word - WP1' by ginda.roadruck - Page 119 of 338

Operator And Field Maintenance For Armament And Electrical Shop P/N 1024506
Page Navigation
  97    98    99    100    101  102  103    104    105    106    107  
img
.
TM 1-4920-500-13&P
0012 00
POSITIONING 60 AND 100 AMP CABLE REEL ASSEMBLIES FOR TRANSPORT MODE
60 and 100 AMP
Cable Reel Assemblies
SSAE091
1. Remove four set screws from floor inserts at 60 and 100 amp cable reel assemblies transport location.
2. Store set screws in secure storage location.
3. Obtain cargo straps from storage location and two ring bolts from shelter BII box.
4. Insert ring bolts into floor inserts and secure.
5. Position 60 and 100 amp cable reel assemblies at transport location.
6. Secure 60 and 100 amp cable reel assemblies to ring bolts with cargo straps.
0012 00-20


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.