TM 1-4920-500-13&P
0012 00
POSITIONING 60 AND 100 AMP CABLE REEL ASSEMBLIES FOR TRANSPORT MODE
60 and 100 AMP
Cable Reel Assemblies
SSAE091
1. Remove four set screws from floor inserts at 60 and 100 amp cable reel assemblies transport location.
2. Store set screws in secure storage location.
3. Obtain cargo straps from storage location and two ring bolts from shelter BII box.
4. Insert ring bolts into floor inserts and secure.
5. Position 60 and 100 amp cable reel assemblies at transport location.
6. Secure 60 and 100 amp cable reel assemblies to ring bolts with cargo straps.