TM 5-3610-256-14
Table 3-1. Organizational Maintenance Lubrication Instructions (Continued)
ITEM NO
2
INTERVAL
6 months or 100 hours
of operation
Section Il. REPAIR PARTS;
ITEM TO BE LUBRICATED
PROCEDURE
CHAIN
Unplug power cord before servicing
machine. Death or injury may re-
sult from failure to comply with this
warning.
a. Power OFF.
b. Unplug power cord.
c. Remove left cover by turning captive
screw (2).
d. Place the I-Ii/Off/Lo switch in the off position.
e. Plug in power cord. Turn power ON.
f. Activate feed switch.
g. Lubricate chain (3).
h. Turn power OF F and unplug power cord.
i. Reinstall left cover by turning captive screw.
j. Plug in power cord.
k. Power ON.
I. Perform operational test.
SPECIAL TOOLS; TEST, MEASUREMENT, AND
DIAGNOSTIC EQUIPMENT; AND SUPPORT EQUIPMENT
3-3. COMMON TOOLS AND EQUIPMENT For authorized common tools and equipment, refer to the
Modified Table of Organization and Equipment (MTOE) applicable to your unit.
3-4. TEST, MEASUREMENT, AND DIAGNOSTIC EQUIPMENT, AND SUPPORT EQUIPMENT.
Test, measurement, and diagnotic equipment, and support equipment are not required for the repair of
this equipment at the organizational level of maintenance.
3-5. REPAIR PARTS AND SPECIAL TOOLS. Repair parts and special tools for this equipment are
Iisted and illustrate in TM 5-3610-256-24P (to be published).
Section Ill. SERVICE UPON RECEIPT OF EQUIPMENT
3-6. GENERAL.
a. lnspect the Reproduction Set for damage incurred during shipment. If the equipment has
Change 1
3-3
