TM 5-4310-381-13
TABLE 2-1. Operators Preventive Maintenance Checks and Services (Continued)
B - Before Operation D - During Operation A - After Operation W - Weekly
8
WHEEL ASSEMBLY
a. Check nut (1) for tightness. Nut should keep
bearing (2) outer race from turning.
b. Check tires (3) for proper inflation of 30 psi.
Tires will not hold air.
c. Check tires (3) for cracks or other signs of
damage.
9
FRAME ASSEMBLY
a. Check rubber bumper (1) for cracks and secure
attachment.
b. Check frame for cracks in weldments
Frame is damaged.
ITEM
NO.
INTERVAL
ITEM TO BE INSPECTED. PROCEDURE:
EQUIPMENT NOT
READY/AVAILABLE IF:
B D A W
2-7