Section II. MOVEMENT TO A NEW WORK SITE
2-4. Dismantling for Movement
NOTE
Do not change loading plan.
a. Disconnect the external power source.
b. Dismantle the canvas tenting (fig. 2-3, 2-4, 2-5
e. Close the shop set (fig. 2-1 and 2-2),
and 2-6).
f. Remove the ground rod.
c. Disconnect welding cables and stow in the
2 - 5 . Reinstallation After Movement
proper comnartments.
d. Secure- all portable equipment in the proper
pIace and latch all drawers.
Section iii. CONTROLS AND INSTRUMENTS
struments are listed in the following subparagraphs
This section describes the various controls and
a. Hydraulic Systems. The two hydraulic systems
instruments and provides the operator or crew
that raise and lower the top doors are each con-
sufficient information required to operate the shop
trolled by a manually operated hydraulic pump
act.
(fig. 2-9 ).
Insert the handle in
the lever on
top of
the pump to operate the pump. Turn the control
The purpose of the controls and instruments and
v a l v e clockwise to raise the doors and coun-
t h e normal and maximum readings of the in-
terclockwise to lower the doors.