Section III. WORKBENCHES
LEFT AND RIGHT SIDE WORKBENCH.
a. General. The two workbenches are located in the center of the
trailer and are mounted to the van floor.
Removal.
b.
(1)
(2)
(3)
Remove portable tool box, socket wrench set, torque
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
Disconnect electrical connections from both workbenches.
Refer to figure 22 and remove eight screws (6) and eight
(12)
washers (7) and eight rivnuts (8) securing the four hold-
down braces (5) to the workbenches.
Remove eight screws (6) securing the four holddown braces
(13)
to ceiling of van.
Remove 36 bolts and 36 washers (18 for each workbench)
(14)
...
securing workbenches to van floor, and remove the two
c. Disassembly. Refer to figure 17 and disassemble the workbenches
and related parts.
Cleaning, Inspection and Repair.
d.
(1) Clean all metal parts with cleaning solvent (P-D-680) and
dry thoroughly. Clean other parts with a clean cloth.