FSN
Application
Material
application
d. H a r d w a r e r e q u i r e d f o r i n s t a l l a t i o n o f
ware items will be drawn from stock or through the
equipment in shop van is listed in Table 5. Hard.
managing activity having supply responsibility.
Table 5. Hardware.
Nomenclature
Application
FSN
Qty
bolt
3
bolt
e. U n u s e d s p a c e i n t h e c a r g o t r u c k m a y b e
(1) There are three work tables 4910-543-
7771, 4910-543-7772, and 4910-205-3046 to be
utilized for transporting and storing other tools, etc.
installed in the cargo truck. The tables, in the
f. Ground all electrically powered tools to the
sequence listed above, are designated B, C, and I.
chassis of the cargo truck as a safety precaution
(2) Place work table (B) flush against the front
against electrical shock to the operator.
wall and right side of truck as shown in figure 2.
g. One ground rod with cable assembly is in-
Locate table (I) on the left side of the truck in a
cluded in the shop set for each cargo truck. Drive
similar manner. Place table (C) toward the rear of
the ground rod into the ground and secure the cable
the truck, flush against the right side, and abutted
assembly to the chassis of the truck each time the
against table (B) as shown in figures 2 and 3. Mark
shop set is placed in operation.
and drill eighteen 11/32-inch holes through the
5. Installation of the Shop Equipment. a.
floor of the truck aligned with the mounting holes
4