• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 4. Relocation of Cable Reel Assembly and 100 amp Power Cable Assembly.
Figure 7. Connecting Main Power Cable to PDB.

Field Maintenance Manual For Sheet Metal Shop Part No. 1035658 And Part No. Sc4920-99-A68
Page Navigation
  33    34    35    36    37  38  39    40    41    42    43  
img
TM 1-4920-435-13&P
0006 00
CONNECTING MAIN POWER CABLE - CONTINUED
CAUTION
Ensure power cable assembly is not twisted, kinked, or placed over sharp rocks or projections.
Where possible, cable should not be routed through any deep ground depressions where water
may accumulate.
Figure 5.
Extending Main Power Cable.
6.
Extend power cable assembly (Figure 5, Item 2) between shop and PDB (Figure 5, Item 1).
Figure 6.
Connecting Main Power Cable to Shelter.
7.
Remove protective dust cap (Figure 6, Item 6) from "J1" receptacle (Figure 6, Item 1) at power entry panel
(Figure 6, Item 2).
8.
Remove protective dust cap (Figure 6, Item 4) from female power connector (Figure 6, Item 5).
0006 00-5


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.