• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 5. Extending Main Power Cable.
INSTALL LIGHTING

Field Maintenance Manual For Sheet Metal Shop Part No. 1035658 And Part No. Sc4920-99-A68
Page Navigation
  34    35    36    37    38  39  40    41    42    43    44  
img
0006 00
TM 1-4920-435-13&P
CONNECTING MAIN POWER CABLE - CONTINUED
9.
Insert female power connector (Figure 6, Item 5) into "J1" receptacle (Figure 6, Item 1) and secure with lock
ring (Figure 6, Item 3).
Figure 7.
Connecting Main Power Cable to PDB.
10. Remove protective dust cap (Figure 7, Item 3) from receptacle at PDB (Figure 7, Item 1).
11. Remove protective dust cap (Figure 7, Item 3) from male power connector (Figure 7, Item 2).
12. Insert male power connector (Figure 7, Item 2) into receptacle at PDB (Figure 7, Item 1) and secure with lock
ring (Figure 7, Item 4).
13. Move circuit breaker located on the PDB from OFF to ON.
14. Move main and other circuit breakers in circuit breaker panel from OFF to ON.
END OF WORK PACKAGE
0006 00-6


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.