• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 16. Remove Sidewall Support Braces.
Figure 2. Connecting PDB to Generator.

Field Maintenance Manual For Sheet Metal Shop Part No. 1035658 And Part No. Sc4920-99-A68
Page Navigation
  29    30    31    32    33  34  35    36    37    38    39  
img
. . . . .
TM 1-4920-435-13&P
0006 00
OPERATOR INSTRUCTIONS
SHEET METAL SHOP
CONNECTING POWER TO THE SHELTER
INITIAL SETUP:
References
Tools and Special Tools
WP 0077 00
Electrical Repairers Tool Kit
TM 9-6150-226-13
(WP 0072 00, Table 2, Item 103 )
TM 9-6150-226-23P
General Mechanics Tool Kit
(WP 0072 00, Table 2, Item 104 )
Equipment Condition
Personnel Required
Functional
CMF 15 Series (2)
EXTERNAL GROUNDING OF SHELTER
NOTE
Shelter is grounded through an externally connected power supply. Consult a qualiied electri-
cian for proper grounding procedures required for surrounding soil conditions.
Figure 1.
External Grounding of Shelter.
1.
Remove ground rod assembly (Figure 1, Item 5 and 6) from shelter BII box.
2.
Remove slide hammer (WP 0077 00, Figure 2, Item 4) from shelter BII box.
0006 00-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.