• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 6. Removing External Grounding Rod.
Figure 2. Removing Cable and Receptacle Assembly.

Field Maintenance Manual For Sheet Metal Shop Part No. 1035658 And Part No. Sc4920-99-A68
Page Navigation
  124    125    126    127    128  129  130    131    132    133    134  
img
. .
TM 1-4920-435-13&P
0035 00
OPERATOR INSTRUCTIONS
SHEET METAL SHOP
REMOVING LIGHTING
INITIAL SETUP:
Tools and Special Tools
Personnel Required
CMF 15 Series (2)
General Mechanics Tool Kit
(WP 0072 00, Table 2, Item 104 )
Equipment Condition
Functional
REMOVING AREA LIGHT
Figure 1.
Removing Area Light.
1.
Disconnect area light cable (Figure 1, Item 10) from either "J3" or "J4" connector (Figure 1, Item 1 or 2) on
power entry panel (Figure 1, Item 9) by loosening lock ring (Figure 1, Item 3).
2.
Replace protective dust cap (Figure 1, Item 11) on "J3" or "J4" connector (Figure 1, Item 1 or 2) on power
entry panel (Figure 1, Item 9).
3.
Replace protective dust cap (Figure 1, Item 11) on area light cable (Figure 1, Item 10).
NOTE
Do not remove wing nuts from screws.
4.
Loosen, do NOT remove, wing nuts (Figure 1, Item 6) and remove area light (Figure 1, Item 5) from location
outside shelter.
5.
Roll up area light cable (Figure 1, Item 10).
6.
Remove bulb and store in shelter BII box.
7.
Install area light (Figure 1, Item 5) on inside ixed personnel end wall by securing mounting screws (Figure 1,
Item 7) to mounting brackets (Figure 1, Item 8) and tightening wing nuts.
0035 00-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.