• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 3. Repositioning Ceiling Lights.
Figure 2. Removing Sidewall Support Braces.

Field Maintenance Manual For Sheet Metal Shop Part No. 1035658 And Part No. Sc4920-99-A68
Page Navigation
  127    128    129    130    131  132  133    134    135    136    137  
img
. .
TM 1-4920-435-13&P
0036 00
OPERATOR INSTRUCTIONS
SHEET METAL SHOP
PREPARING SHELTER FOR TRANSPORT
INITIAL SETUP:
Personnel Required
Tools and Special Tools
General Mechanics Tool Kit
CMF 15 Series (4)
(WP 0072 00, Table 2, Item 104 )
Equipment Condition
Functional
WARNING
Do not attempt to remove leveling support jack assemblies until after shelter has been lowered.
Removing leveling support jack assemblies without properly lowering shelter risks serious
INJURY to personnel.
NOTE
Ensure hinged loor is clear of items or debris and loor hinges are clean of sand or dirt.
Ensure top of hinged roof is clear of items, debris, snow, or ice and hinged loor extension
is clear of foreign matter, snow, or ice.
When loor is lowered, (to allow roof clearance for folding) devices securing fold-out loor
support cables can be disengaged.
RELEASING SHELTER LATCHES
1.
Remove two removable latches from hinged sidewall.
2.
Remove one removable latch from each hinged end wall.
3.
Place four removable latches in shelter BII box.
CAUTION
It is essential that non-removable latches are pressed lat into pans.
4.
Release sixteen non-removable latches between hinged sidewall, end wall, roof, and loor and press lat in
pans.
0036 00-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.