TM 1-4920-435-13&P
0042 00
INSTALLATION CONTINUED
SHELF CABINET (C) CONTINUED
b.
Ensure work surface (Figure 5, Item 5) is lush with back side of cabinet with a two inch over hang on the
front side of cabinet. Work surface (Figure 5, Item 5) should over hang 15.00 inches on left and right side
of cabinet
c.
On inside of cabinet (C) (Figure 5, Item 6), mark eight hole placements in top of cabinet on non-inished
side of work surface (Figure 5, Item 5).
d.
After eight hole placement marks have been made, lip work surface (Figure 5, Item 5) over with non-
inished side up.
e.
On non-inished side of work surface (Figure 5, Item 5) at eight marked hole placements, center punch
and drill eight 5/16 inch holes to a depth of 3/4 inch.
f.
Return work surface (Figure 5, Item 5) inished side up, on top of cabinet (C) (Figure 5, Item 6).
g.
Align bolt holes in work surface (Figure 5, Item 5) with bolt holes on top of cabinet (C) (Figure 5, Item 6).
h.
Install lag eight bolts (Figure 5, Item 1), eight lock washers (Figure 5, Item 2), six large lat washers
(Figure 5, Item 3), and two small lat washers (Figure 5, Item 4) securing work surface (Figure 5, Item 5)
to cabinet (C) (Figure 5, Item 6).
3.
Install four bolts (Figure 5, Item 8), eight lat washers (Figure 5, Item 4), four lock washers (Figure 5, Item 2),
and four nuts (Figure 5, Item 9) securing two cabinet brackets (Figure 5, Item 7) into cabinet (C) (Figure 5,
Item 6).
4.
If a new cabinet (C) (Figure 5, Item 6) has been installed:
a.
Use holes (Figure 5, Item 14 and 15) of existing work surface (Figure 5, Item 5) to determine drill bit
sizes.
b.
Match drill holes of work surface (Figure 5, Item 5) through cabinet (C) (Figure 5, Item 6).
5.
If a new work surface (Figure 5, Item 5) has been installed and/or a new work surface (Figure 5, Item 5) and
cabinet (C) (Figure 5, Item 6) has been installed:
a.
Position left bolt hole of bench grinder 23.50 inches from left side of work surface (Figure 5, Item 5) and
4.50 inches from front of work surface (Figure 5, Item 5). Mark two placement holes (Figure 5, Item 14
and 15). Set aside grinder.
b.
Center punch and drill two 1/2 inch holes through work surface (Figure 5, Item 5) and cabinet (C) (Figure
5, Item 6).
6.
Install hardware attaching cabinet (C) (Figure 5, Item 6) to shelter loor IAW WP 0043 00, Cabinets (B) and
(C) Hardware, INSTALLATION.
7.
Install drawers, slides, and shelves as necessary (Drawers, Slides, And Shelves, INSTALLATION).
8.
Install kick plate (Kick Plate, INSTALLATION).
0042 00-11