• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
FOUR DRAWER CABINET (D), SIX DRAWER CABINET (E), AND FOUR DRAWER CABINET (F)
MAINTENANCE INSTRUCTIONS FOR CABINET INTEGRATION HARDWARE

Field Maintenance Manual For Sheet Metal Shop Part No. 1035658 And Part No. Sc4920-99-A68
Page Navigation
  170    171    172    173    174  175  176    177    178    179    180  
img
.
TM 1-4920-435-13&P
0042 00
INSTALLATION CONTINUED
d.
Measure from right side of work surface (Figure 6, Item 7) towards left 12.00 inches and from front of
work surface (Figure 6, Item 7) towards back 16.25 inches and mark measurement (Figure 6, Item 14).
e.
Center punch and drill two 1/2 inch holes (Figure 6, Item 11 and 12) through work surface (Figure 6, Item
7) and cabinet (E) (Figure 6, Item 10).
f.
Center punch and drill two 1/2 inch holes (Figure 6, Item 13 and 14) through work surface (Figure 6, Item
7) and cabinet (F) (Figure 6, Item 9).
9.
Install hardware attaching cabinet (D) (Figure 6, Item 4), cabinet (E) (Figure 6, Item 10) and cabinet (F)
(Figure 6, Item 9) to shelter loor IAW WP 0043 00, Cabinets (D), (E), and (F) Hardware, INSTALLATION.
10. Install drawers, slides, and shelves as necessary (Drawers, Slides, And Shelves, INSTALLATION).
11. Install kick plate (Kick Plate, INSTALLATION).
END OF WORK PACKAGE
0042 00-15/16 blank


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.