0057 00
INSTALLATION CONTINUED
AIR FEED-THRU CONNECTOR ASSEMBLY CONTINUED
Figure 11.
Install Air Feed-thru Connector Assembly.
2.
Install new air feed-thru connector assembly (Figure 11, Item 2) from outside of shelter with long end through
hole.
Figure 12.
Attach Air Feed-thru Connector Assembly.
3.
Install all but one screw (Figure 12, Item 1), have assistant install lat washers (Figure 12, Item 2), lock
washers (Figure 12, Item 3), and nuts (Figure 12, Item 4) inside of shelter and secure.
4.
Replace one lanyard (Figure 12, Item 5) on outside of shelter and install screw (Figure 12, Item 1).
5.
Have assistant install lat washer (Figure 12, Item 2), lock washer (Figure 12, Item 3), second lanyard (Figure
12, Item 5), and nut (Figure 12, Item 4) on inside of shelter.
6.
Tighten screws (Figure 12, Item 1).
END OF WORK PACKAGE