• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 7. Connecting Main Power Cable to PDB.
Figure 2. Installing Ceiling Lights.

Maintenance Manual For Production/ Quality Control Shop Part No. 1036659 And Part No. Sc4920-99-Cla66
Page Navigation
  36    37    38    39    40  41  42    43    44    45    46  
img
. . .
TM 1-4920-440-13&P
0007 00
OPERATOR INSTRUCTIONS
PRODUCTION/QUALITY CONTROL SHOP
INSTALL LIGHTING
INITIAL SETUP:
References
Tools and Special Tools
WP 0002 00
General Mechanics Tool Kit
(WP 0063 00, Table 2, Item 104 )
Equipment Condition
Personnel Required
Functional
CMF 15 Series (2)
INSTALLING CEILING LIGHTS
WARNING
Inhalation of phosphorous dust could cause SERIOUS INJURY to personnel. In an event of
lamp breakage, care must be taken in removal of broken glass fragments and white phospho-
rous dust that may be dispersed within ixture.
Figure 1.
Main Circuit Breaker.
1.
Set main circuit breaker and all other circuit breakers in breaker panel to the OFF position.
0007 00-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.