TM 1-4920-440-13&P
OPERATOR INSTRUCTIONS
PRODUCTION/QUALITY CONTROL SHOP
PREPARING SHELTER FOR ECU STOWAGE
INITIAL SETUP:
References
Tools and Special Tools
General Mechanics Tool Kit
Equipment Condition
Personnel Required
Functional
CMF 15 Series (2)
CLOSING ECU FOLD-DOWN PANELS
NOTE
Skip this Work Package if ECUs are not installed.
Figure 1.
Removing T-seal.
1.
Remove T-seal (Figure 1, Item 1) from gap located between ECU (B) fold-down panel (Figure 1, Item 2) and
ECU (B) security screen at cargo end of shelter.
2.
Store T-seal (Figure 1, Item 1) in shelter Basic Issue Items (BII) box (WP 0002 00, Figure 2, Item 5 or Figure
3, Item 6).
0031 00-1