• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 11. Stowing Leveling Support Jack Assemblies.
Figure 1. Storm Coniguration Kit.

Maintenance Manual For Production/ Quality Control Shop Part No. 1036659 And Part No. Sc4920-99-Cla66
Page Navigation
  128    129    130    131    132  133  134    135    136    137    138  
img
. . .
TM 1-4920-440-13&P
0035 00
OPERATOR INSTRUCTIONS
PRODUCTION/QUALITY CONTROL SHOP
OPERATION UNDER UNUSUAL CONDITIONS
INITIAL SETUP:
References
Tools and Special Tools
WP 0002 00
General Mechanics Tool Kit
(WP 0063 00, Table 2, Item 104 )
Equipment Condition
Personnel Required
Functional
CMF 15 Series (6)
UNUSUAL ENVIRONMENT/WEATHER
OPERATION IN RAIN AND/OR MUD
1.
When setting up shelter, place wood planks or boards under each jack pad to increase bearing area.
2.
Provide adequate drainage ditch to prevent standing water around shelter area.
3.
Check ISO and hinged jack assemblies frequently for sinking and level shelter as required by adjusting ISO
and hinged jack assemblies.
4.
Close and secure all doors in shelter.
5.
Check seals for proper placement and compression.
OPERATION IN SNOW, ICE OR EXTREME COLD
WARNING
In extreme cold, do not touch metal parts with bare hands. Severe skin damage may result.
NOTE
Fluorescent lights have a delay time in coming on at temperatures of 0F and below.
1.
Frequently remove snow from roof with a soft bristle brush, broom, or equivalent.
2.
Remove ice from shelter before lowering hinged panels.
3.
Ensure ECUs are properly positioned.
4.
Keep all doors and vents closed.
0035 00-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.