TM 1-4920-500-13&P
0010 00
ARMAMENT AND ELECTRICAL SHOP
OPERATION UNDER USUAL CONDITIONS
CHECKING SHELTER LEVEL
After all equipment has been placed in the suggested operational position, recheck leveling of shelter. See WP
0005 00, Initial Leveling, to verify and adjust shelter level. Correct leveling adjustments are essential to ensure
proper operation of equipment, tools, doors, and access panels.
The Armament and Electrical Shop is now operational.
End of Work Package