• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
'Microsoft Word - WP1' by ginda.roadruck - Page 175 of 338
'Microsoft Word - WP1' by ginda.roadruck - Page 177 of 338

Operator And Field Maintenance For Armament And Electrical Shop P/N 1024506
Page Navigation
  155    156    157    158    159  160  161    162    163    164    165  
img
.
TM 1-4920-500-13&P
0024 00
2
3
1
4
5
6
SSAE134
INSPECT
Inspect power static inverter (1) for loose bolts (2) and tighten if necessary.
REPLACE
1. Remove four bolts (2), eight flat washers (3 and 4), four lock washers (5) and four nuts (6).
2. Replace power static inverter (1) by installing four bolts (2), eight flat washers (3 and 4), four lock washers (5)
and four nuts (6).
End of Work Package
0024 00-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.