• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
'Microsoft Word - WP1' by ginda.roadruck - Page 209 of 338
'Microsoft Word - WP1' by ginda.roadruck - Page 211 of 338

Operator And Field Maintenance For Armament And Electrical Shop P/N 1024506
Page Navigation
  189    190    191    192    193  194  195    196    197    198    199  
img
.
TM 1-4920-500-13&P
0033 00
1
4
2
3
SSAE155
INSPECT
1. Move main circuit breaker to OFF position.
2. Remove four screws (3) attaching power entry panel cover (1) which is located below circuit breaker panel.
3. Remove power entry panel cover (1) from power entry panel.
4. Visually inspect BNC connectors (4) and cable (2) for damage.
5. Move main circuit breaker to ON position.
TEST
1. Move main circuit breaker to OFF position.
2. Remove four screws (3) attaching power entry panel cover (1) which is located below circuit breaker panel.
3. Remove power entry panel cover (1) from power entry panel.
4. Test BNC cable (2) for continuity.
5. Replace BNC cable (2) if breakage is detected.
6. Move main circuit breaker to ON position.
0033 00-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.