• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 1. Leveling Support Jack Assemblies.
Figure 3. Load Balancer Slide Stops, Upper Positions.

Operator Manual \(Rpstl\) For Pneudraulic Shop P/N Sc4920-99-Clc64 And Part No 1036258
Page Navigation
  15    16    17    18    19  20  21    22    23    24    25  
img
TM 1-4920-433-13&P
0005 00
ASSEMBLY AND PREPARATION FOR USE CONTINUED
NOTE
Stencil on leveling support jack indicate handle rotation to raise or lower jack.
Figure 2.
Leveling Support Jack Install.
3.
Ensure leveling support jack assemblies (Figure 2, Item 8) are lowered completely.
4.
Place upper jack attachment insert (Figure 2, Item 2) on upper jack support bracket (Figure 2, Item 4) on
corner post.
5.
Insert jack attachment (Figure 2, Item 6) into lower ISO itting (Figure 2, Item 5) of shelter.
6.
Turn locking handle (Figure 2, Item 7) to rotate jack attachment on leveling support jack (Figure 2, Item 8) to
lock.
7.
Rotate handle (Figure 2, Item 1) counterclockwise on leveling support jack to raise until safety pin (Figure 2,
Item 3) can be installed.
8.
Install safety pin (Figure 2, Item 3).
9.
Repeat Steps 3 through 8 at three remaining corner posts.
CAUTION
Leveling support jack assemblies must be raised simultaneously to prevent excessive strain on
leveling support jack assemblies or shelter. Shelter must be raised a minimum of 3 inches (7.6
centimeters (cm)) off ground.
10. Simultaneously raise leveling support jack assemblies (Figure 2, Item 8) at each corner of shelter.
0005 00-3


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.