• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 5. Load Balancer Slide Stops, Lower Position.
Figure 8. Hinged Jack Assemblies.

Operator Manual \(Rpstl\) For Pneudraulic Shop P/N Sc4920-99-Clc64 And Part No 1036258
Page Navigation
  19    20    21    22    23  24  25    26    27    28    29  
img
TM 1-4920-433-13&P
0005 00
POSITIONING HINGED SIDEWALL
Figure 6.
Positioning Hinged Wall.
1.
Remove two sidewall support braces (Figure 7, Item 2) from Shelter BII box.
2.
Raise hinged sidewall and hold in position.
Figure 7.
Sidewall Support Braces.
3.
Install two sidewall support braces (Figure 7, Item 2) in brace cups marked "A" (Figure 7, Item 3) on hinged
loor and sidewall behind support cable (Figure 7, Item 1).
0005 00-7


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.