0044 00
TM 1-4920-433-13&P
REMOVAL
Remove two bolts (Figure 1, Item 2), two upper lat washers (Figure 1, Item 3), two lower lat washers (Figure
1, Item 4), two lock washers (Figure 1, Item 5), and two nuts (Figure 1, Item 6).
INSTALLATION
Replace upright drilling machine (Figure 1, Item 1) by installing two bolts (Figure 1, Item 2), two lower lat washers
(Figure 1, Item 3), two upper lat washers (Figure 1, Item 4), two lock washers (Figure 1, Item 5), and two nuts
(Figure 1, Item 6).
END OF WORK PACKAGE
0044 00-2