• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2. Wall and Floor Insert Inspection.
MAINTENANCE INSTRUCTIONS FOR BAYONET NEILL-CONCELMAN (BNC) CONNECTOR ASSEMBLY - Continued

Operator Manual \(Rpstl\) For Pneudraulic Shop P/N Sc4920-99-Clc64 And Part No 1036258
Page Navigation
  173    174    175    176    177  178  179    180    181    182    183  
img
. . .
TM 1-4920-433-13&P
0047 00
FIELD MAINTENANCE
PNEUDRAULIC SHOP
MAINTENANCE INSTRUCTIONS FOR BAYONET NEILL-CONCELMAN (BNC) CONNECTOR ASSEMBLY
INITIAL SETUP:
Personnel Required
Tools and Special Tools
CMF 15 Series (1)
Electrical Repairers Tool Kit
Equipment Condition
(WP 0062 00, Table 2, Item 103 )
Functional
Multimeter (WP 0062 00, Table 2, Item 106 )
WARNING
HIGH VOLTAGE exists in electrical system of shop. All electrical inspections, repairs, or
replacements will be performed with power OFF and only by a qualiied electrician. Serious
shock hazards exist which could result in INJURY OR EVEN DEATH to personnel.
NOTE
During installation of components same hardware should be used so as to maintain the original
integrity of the shop set.
INSPECTION OF INSTALLED ITEMS
Figure 1.
Inspect and Test BNC Connector Assembly.
1.
Move main circuit breaker to OFF position.
0047 00-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.