• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
MAINTENANCE INSTRUCTIONS FOR BAYONET NEILL- CONCELMAN (BNC) CONNECTOR ASSEMBLY
MAINTENANCE INSTRUCTIONS FOR BAYONET NEILL- CONCELMAN (BNC) CONNECTOR ASSEMBLY

Field Maintenance Manual For Sheet Metal Shop Part No. 1035658 And Part No. Sc4920-99-A68
Page Navigation
  210    211    212    213    214  215  216    217    218    219    220  
img
0056 00
TM 1-4920-435-13&P
INSPECTION OF INSTALLED ITEMS CONTINUED
5.
Move main circuit breaker to ON position.
TEST AND INSPECTION
1.
Move main circuit breaker to OFF position.
2.
Remove four screws (Figure 1, Item 3) attaching power entry panel cover (Figure 1, Item 1) which is located
below circuit breaker panel.
3.
Remove power entry panel cover (Figure 1, Item 1) from power entry panel.
4.
Test BNC connector (Figure 1, Item 2) for continuity.
5.
Replace BNC connector (Figure 1, Item 2) if breakage is detected.
6.
Move main circuit breaker to ON position.
REMOVAL
WARNING
HIGH VOLTAGE exists in electrical system of shop. All electrical inspections, repairs, or
replacements will be performed with power OFF and only by a qualiied electrician. Serious
shock hazards exist which could result in INJURY OR EVEN DEATH to personnel.
Figure 2.
Replace BNC Connector Assembly.
1.
Move main circuit breaker to OFF position.
0056 00-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.