• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
MAINTENANCE INSTRUCTIONS FOR FIRST AID BRACKET ASSEMBLY AND HARDWARE - Continued
MAINTENANCE INSTRUCTIONS FOR 60 AMP RECEPTACLE - Continued

Field Maintenance Manual For Sheet Metal Shop Part No. 1035658 And Part No. Sc4920-99-A68
Page Navigation
  215    216    217    218    219  220  221    222    223    224    225  
img
. . . .
TM 1-4920-435-13&P
0058 00
FIELD MAINTENANCE
SHEET METAL SHOP
MAINTENANCE INSTRUCTIONS FOR 60 AMP RECEPTACLE
INITIAL SETUP:
Personnel Required
Tools and Special Tools
CMF 15 Series (1)
Electrical Repairers Tool Kit
(WP 0072 00, Table 2, Item 103 )
Equipment Condition
General Mechanics Tool Kit
Functional
(WP 0072 00, Table 2, Item 104 )
Multimeter (WP 0072 00, Table 2, Item 106 )
WARNING
HIGH VOLTAGE exists in electrical system of shop. All electrical inspections, repairs, or
replacements will be performed with power OFF and only by a qualiied electrician. Serious
shock hazards exist which could result in INJURY OR EVEN DEATH to personnel.
NOTE
During installation of components same hardware should be used so as to maintain original
integrity of shop set.
INSPECTION OF INSTALLED ITEMS
60 AMP RECEPTACLE
Figure 1.
60 amp Receptacle.
1.
Move main circuit breaker to OFF position.
2.
Ensure 60 amp receptacle (Figure 1, Item 2) connections are not loose or damaged.
0058 00-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.