Figure 2. Wall and Floor Insert Inspection.
Figure 2. Replace BNC Connector Assembly.

Field Maintenance Manual For Sheet Metal Shop Part No. 1035658 And Part No. Sc4920-99-A68
Page Navigation
  209    210    211    212    213  214  215    216    217    218    219  
img
. . .
TM 1-4920-435-13&P
0056 00
FIELD MAINTENANCE
SHEET METAL SHOP
MAINTENANCE INSTRUCTIONS FOR BAYONET NEILL- CONCELMAN (BNC) CONNECTOR ASSEMBLY
INITIAL SETUP:
Tools and Special Tools
Personnel Required
CMF 15 Series (1)
Electrical Repairers Tool Kit
Equipment Condition
(WP 0072 00, Table 2, Item 103 )
Multimeter (WP 0072 00, Table 2, Item 106 )
Functional
WARNING
HIGH VOLTAGE exists in electrical system of shop. All electrical inspections, repairs, or
replacements will be performed with power OFF and only by a qualiied electrician. Serious
shock hazards exist which could result in INJURY OR EVEN DEATH to personnel.
NOTE
During installation of components same hardware should be used so as to maintain the original
integrity of the shop set.
INSPECTION OF INSTALLED ITEMS
Figure 1.
Inspect and Test BNC Connector Assembly.
1.
Move main circuit breaker to OFF position.
2.
Remove four screws (Figure 1, Item 3) attaching power entry panel cover (Figure 1, Item 1) which is located
below circuit breaker panel.
3.
Remove power entry panel cover (Figure 1, Item 1) from power entry panel.
4.
Visually inspect BNC connectors (Figure 1, Item 4) and cable (Figure 1, Item 2) for damage.