0040 00
TM 1-4920-438-13&P
INSTALLATION CONTINUED
SHELF CABINET (A) AND 3 DRAWER CABINET (B) CONTINUED
i.
Install four lag bolts (Figure 3, Item 4), four lock washers (Figure 3, Item 3), and four lat washers (Figure
3, Item 2) securing work surface (Figure 3, Item 12) to cabinet (A) (Figure 3, Item 7) and cabinet (B)
(Figure 3, Item 6).
4.
If either a new cabinet (A) (Figure 3, Item 7 or cabinet (B) (Figure 3, Item 6) has been installed:
a.
Use holes (Figure 3, Item 8 through 11) of existing work surface (Figure 3, Item 12) to determine drill bit
sizes.
b.
Match drill holes of work surface (Figure 3, Item 12) through cabinet (A) (Figure 3, Item 7) and cabinet
(B) (Figure 3, Item 6).
5.
If a new work surface (Figure 3, Item 12) has been installed and/or a new work surface (Figure 3, Item 12)
and cabinet (A) (Figure 3, Item 7) or cabinet (B) (Figure 3, Item 6) has been installed:
a.
Position left side of upright drilling machine 6.25 inches from left side of work surface (Figure 3, Item 12)
and front side of upright drilling machine 0.75 inch from front of work surface (Figure 3, Item 12). Mark
placement holes (Figure 3, Item 8 and 9). Set aside upright drilling machine.
b.
Position back side of dry ice maker 22.00 inches from right side of work surface (Figure 3, Item 12) and
right side of dry ice maker 6 inches from back side of work surface (Figure 3, Item 12). Mark placement
holes (Figure 3, Item 10 and 11). Set aside dry ice maker.
c.
Center punch and drill four 1/2 inch holes through work surface (Figure 3, Item 12) and cabinet (A)
(Figure 3, Item 7) and cabinet (B) (Figure 3, Item 6).
6.
Install hardware attaching cabinet (A) Figure 3, Item 7) and cabinet (B) (Figure 3, Item 6 to shelter wall and
7.
Install drawers, slides, and shelves as necessary (Drawers, Slides, And Shelves, INSTALLATION).
8.
Install kick plate (Kick Plate, INSTALLATION).
0040 00-6