• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
MAINTENANCE INSTRUCTIONS FOR CABINET ASSEMBLIES - Continued
MAINTENANCE INSTRUCTIONS FOR CABINET ASSEMBLIES - Continued

Aviation Maintenance Manual For Power Train Shop P/N 1036459 And P/N Sc492097Cla65
Page Navigation
  161    162    163    164    165  166  167    168    169    170    171  
img
.
TM 1-4920-438-13&P
0040 00
INSTALLATION CONTINUED
b.
Position open throat press lush against left side of work surface (Figure 6, Item 4) and back left corner of
open throat press 6.50 inches from back side of work surface (Figure 6, Item 4). Mark placement holes
(Figure 6, Item 14, 15, 16 and 17). Set aside open throat press.
c.
Center punch and drill eight 1/2 inch holes through work surface (Figure 6, Item 4) and cabinet (F)
(Figure 6, Item 4).
4.
Install hardware attaching cabinet (F) (Figure 6, Item 5) to shelter loor IAW WP 0041 00, Cabinet E, F and G
Hardware, INSTALLATION.
5.
Install drawers, slides, and shelves as necessary (Drawers, Slides, And Shelves, INSTALLATION).
6.
Install kick plate (Kick Plate, INSTALLATION).
0040 00-15


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.