• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 1. Ton Press.
MAINTENANCE INSTRUCTIONS FOR MACHINIST VISE AND HARDWARE

Aviation Maintenance Manual For Power Train Shop P/N 1036459 And P/N Sc492097Cla65
Page Navigation
  182    183    184    185    186  187  188    189    190    191    192  
img
TM 1-4920-438-13&P
0047 00
INSTALLATION
1.
To install 25 ton press (Figure 1, Item 1), install eight bolts (Figure 1, Item 5), eight lock washers (Figure 1,
Item 4), and eight lat washers (Figure 1, Item 3).
2.
Torque bolts (Figure 1, Item 5) 160-190 in. lbs.
END OF WORK PACKAGE
0047 00-3/4 blank


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.