OPERATION UNDER USUAL CONDITIONS: SITING REQUIREMENTS
Figure 2. Leveling Support Jack Install.

Maintenance Manual For Production/ Quality Control Shop Part No. 1036659 And Part No. Sc4920-99-Cla66
Page Navigation
  14    15    16    17    18  19  20    21    22    23    24  
img
.
0005 00
TM 1-4920-440-13&P
ASSEMBLY AND PREPARATION FOR USE
WARNING
Four personnel are required to perform all of the following procedures. Failure to observe
warning could result in SERIOUS INJURY to personnel.
NOTE
Each shelter is equipped with six container jacks. Four leveling support jack assemblies
are used on ixed side to lift and level shelter and two hinged jack assemblies are used on
expanded side to level hinged loor after expansion.
Refer to WP 0035 00 for unusual ground conditions.
Figure 1.
Leveling Support Jack.
1.
Remove four leveling support jack assemblies (Figure 1, Item 2) from inside of personnel and right cargo
doors (Figure 1, Item 1) by turning locking handle (Figure 1, Item 5) to loosen jack attachment (Figure 1, Item
3) and remove safety pin (Figure 1, Item 4).
2.
Position leveling support jack assemblies at each corner of shelter.
0005 00-2


Privacy Statement