0039 00
TM 1-4920-441-13&P
INSTALLATION
CABINET (G) AND (H) HARDWARE
1.
Install four bolts (Figure 5, Item 4), four lock washers (Figure 5, Item 5), and four lat washers (Figure 5, Item
6) securing two cabinet brackets (Figure 5, Item 3) to shelter loor.
Torque bolts (Figure 5, Item 4) 160-190 in. lbs.
2.
3.
Install slides, drawers, and shelves as necessary IAW WP 0038 00, Drawers, Slides, And Shelves,
INSTALLATION .
4.
Install kick plate IAW WP 0038 00, Kick Plate, INSTALLATION.
END OF WORK PACKAGE
0039 00-10