TM 1-4920-924-13&P
OPERATOR INSTRUCTIONS
AVIATION SHOP EQUIPMENT CONTACT MAINTENANCE (AV SECM) SYSTEM
OPERATION UNDER USUAL CONDITIONS
INITIAL SETUP:
Personnel Required
CMF 15 Series (1)
OPERATION OF SECM ROADSIDE ASSEMBLY DRAWER SLIDES
Opening
NOTE
Opening operating procedures are alike for all sliding shelves installed on the SECM roadside
assembly.
1
2
3
SECM0003
Figure 1. SECM Roadside Assembly Drawer Slides
1.
On SECM roadside assembly (Figure 1, Item 1) press down on yellow lever (Figure 1, Item 2) installed on
right side of the shelf assembly (Figure 1, Item 3).
2.
While holding yellow lever (Figure 1, Item 2) down, pull out shelf assembly (Figure 1, Item 3).
3.
When shelf assembly (Figure 1, Item 3) is pulled out to the maximum distance, shelf assembly
(Figure 1, Item 3) will lock into open position.
00051