0020 00
TM 1-4940-355-12&P
WARNING
Six people are required to lift and move Main Box Assembly. Empty Main Box of
all contents.
NOTE
A forklift with at least 40-inch tines may also be used to lift Main Box Assembly.
3. Using lifting handles, pick up and place main box in HMMWV cargo bed. (Figure 2).
MS019475
Figure 2. Main Box Installed
Change 1