TM 10-5411-236-13&P
0013 00
Table 1. Operator Troubleshooting (cont'd)
Malfunction
Test or inspection
Corrective action required
Push back into connected position,
Check for cocked/twisted
realign MHE and repeat
condition. Check to ensure
6. Unable to Separate FPU-8/12
disconnecting process. Retract
Containers.
horizontal interconnectors
horizontal interconnector adjuster
are fully retracted.
bolt to the fully retracted position.
Inspect for debris on roller
Clean as required. (Refer to WP
7. Unable to Install Rear Roller
bracket saddle, rear support
beam on the FPU-8 and
Assembly to FPU-8.
roller pinning holes.
8. Unable to Install Fork Pocket
Clean as required. (Refer to WP
Inspect for debris.
Adapter Plug into FPU-8 Fork
Pocket.
Inspect for debris. Ensure
Clean as required. Using HEMTT,
container is pushed all the
push the container onto the trailer
way back until the both
until both rollers make contact with
9. Unable to Insert The 1 " PLS
roller are touching the roller
the PLS trailer roller stops. Switch
Trailer Load Securing Pin.
stops on the PLS trailer.
plug for proper orientation
(right / left oriented).
Inspect for debris or
obstructions in filter track
Clean/clear as required. Clean as
area. Inspect for debris in
necessary. Clear as necessary.
10. Filter Cover Plate Does Not
the filter cover plate
Close.
retention mechanism.
Inspect release cable to
ensure it is not fouled.
Inspect for debris in the
Clean as necessary. (Refer to WP
11. Filter Cover Plate Will Not
filter cover plate retention
Lock into Open Position.
mechanism.
Inspect container position to
Relocate container to level ground.
12. Unable to Open Door/Doors.
ensure it is on level ground.
Align door/doors
Inspect door for
misalignment.
Close inner door and retry. (Refer to
Inspect to determine if inner
door handle is in the open
position.
Inspect for debris in door
Clean debris from threshold.
13. Unable to Close Door/Doors.
threshold.
Close outer doors and retry.
Inspect outer doors to
ensure they are in the
Align door/doors
closed position.
Relocate container to level ground.
Inspect door for
misalignment.
Retry with right door slightly ahead of
Inspect container position to
the left to ensure proper seal
ensure it is on level ground.
Inspect to ensure door is
being closed with proper
seal orientation.
0013 00-2