0036 00
TM 1-4920-433-13&P
INSTALLATION CONTINUED
SHELF CABINET (A) AND 3 DRAWER CABINET (B) CONTINUED
5.
Install four lag bolts (Figure 3, Item 4), four lock washers (Figure 3, Item 3), and four lat washers (Figure 3,
Item 2) securing work surface (Figure 3, Item 11) to cabinet (A) (Figure 3, Item 7) and cabinet (B) (Figure 3,
Item 6).
6.
If a new cabinet (A) (Figure 3, Item 7) has been installed:
a.
Use holes (Figure 3, Item 8 through 10) of existing work surface (Figure 3, Item 11) to determine drill bit
sizes.
b.
Match drill holes of work surface (Figure 3, Item 11) through cabinet (A) (Figure 3, Item 7).
7.
If a new work surface (Figure 3, Item 11) has been installed and/or a new work surface (Figure 3, Item 11)
and cabinet (A) (Figure 3, Item 7) has been installed:
a.
Measure from left side of work surface (Figure 3, Item 11) towards right 3.25 inches and from front of
work surface (Figure 3, Item 11) towards back 8.50 inches and mark measurement (Figure 3, Item 9 ).
b.
Measure from left side of work surface (Figure 3, Item 11) towards right 13.00 inches and from front of
work surface (Figure 3, Item 11) towards back 8.50 inches and mark measurement (Figure 3, Item 10).
c.
Measure from left side of work surface (Figure 3, Item 11) towards right 8.00 inches and from front of
work surface (Figure 3, Item 11) towards back 22.00 inches and mark measurement (Figure 3, Item 8).
d.
Center punch and drill three 1/2 inch holes through work surface (Figure 3, Item 11) and cabinet (A)
(Figure 3, Item 7).
8.
Install hardware attaching cabinet (A) (Figure 3, Item 7) and cabinet (B) (Figure 3, Item 6) to shelter wall and
loor IAW (WP 0037 00, Cabinets (A) and (B) Hardware, INSTALLATION).
9.
Install drawers, slides, and shelves as necessary IAW (Drawers, Slides, And Shelves, INSTALLATION).
10. Install kick plate IAW (Kick Plate, INSTALLATION).
0036 00-6