• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CHAPTER 4. FIELD LEVEL MAINTENANCE INSTRUCTIONS FOR POWER TRAIN SHOP
PREVENTIVE MAINTENANCE CHECKS AND SERVICE (PMCS) INTRODUCTION

Aviation Maintenance Manual For Power Train Shop P/N 1036459 And P/N Sc492097Cla65
Page Navigation
  137    138    139    140    141  142  143    144    145    146    147  
img
. . . . . . . . . . . . . . . . . . . . . . . .
TM 1-4920-438-13&P
0037 00
FIELD MAINTENANCE
POWER TRAIN SHOP
SERVICE UPON RECEIPT
INITIAL SETUP:
References (cont.)
Tools and Special Tools
General Mechanics Tool Kit
WP 0044 00
(WP 0067 00, Table 2, Item 104 )
WP 0045 00
Personnel Required
WP 0046 00
CMF 15 Series (2)
WP 0047 00
References
WP 0048 00
WP 0049 00
TM 10-5411-201-14
WP 0050 00
Mechanical Refrigerator Freezer Owner s Manual
WP 0042 00
Sperian Fendell Pure Flow 1000 Eyewash Station
WP 0053 00
Owner s Manual
WP 0058 00
WP 0041 00
WP 0059 00
WP 0042 00
WP 0060 00
WP 0043 00
SERVICE UPON RECEIPT OF MATERIEL
CHECKING UNPACKED EQUIPMENT
CHECKING EQUIPMENT
1.
Inspect cabinet assemblies to ensure that mounting hardware is irmly secured to loor and walls
(WP 0041 00).
2.
Inspect all equipment that is installed to walls and loors to ensure that all items are still irmly secured
(WP 0043 00 through WP 0042 00,WP 0053 00, WP 0058 00, WP 0059 00, and WP 0061 00).
3.
Preventive Maintenance (PM) and preoperational services will be performed IAW applicable shelter equip-
ment TM s or owner s manuals listed below.
a.
TM 10-5411-201-14, Operator, Organizational, Direct Support, and General Support Maintenance for
Shelter, Tactical, Expandable, One-Sided.
b.
Mechanical Refrigerator Freezer Owner s Manual
c.
Sperian Fendell Pure Flow 1000 Eyewash Station Owner s Manual
END OF WORK PACKAGE
0037 00-1/2 blank


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.