• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Table 1. PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) - Continued
Figure 1. Curbside Assembly

Maintenance Manual For Aviation Shop Equipment Contact Maintenance System
Page Navigation
  25    26    27    28    29  30  31    32    33    34    35  
img
. . . . . . . . . .
0011
TM 1-4920-924-13&P
FIELD MAINTENANCE
AVIATION SHOP EQUIPMENT CONTACT MAINTENANCE (AV SECM) SYSTEM
MAINTENANCE INSTRUCTIONS FOR CURBSIDE ASSEMBLY
INITIAL SETUP:
Tools and Special Tools
Personnel Required
10-32 Helical Insert Tool (WP 0032, Item 1)
CMF15 Series - 3
Airframe Repairer Tool Kit (WP 0032, Item 2)
Structural Aircraft Repairer 15G (1)
Aviation Foot Locker Tool Set (WP 0032, Item 3)
References
General Mechanics Tool Kit (WP 0032, Item 4)
Tap, 10-32 (WP 0032, Item 7)
Equipment Condition
Tap Handle 10-32 (WP 0032, Item 8)
Mission essential equipment removed from SECM
curbside rack assembly.
Materials/Parts
Air compressor removed from van loor.
Enamel (Seafoam Green) (WP 0031, Item 1)
Ring bolts removed from van loor.
Epoxy Primer Coating Kit (WP 0031, Item 2)
Polyurethane Coating (Black (WP 0031, Item 3)
WARNING
SECM curbside rack assembly weights 310 lbs. Disassemble and assemble rack assembly in
layers while inside of van to allow for safe lifting IAW MILSTD- 1472.
CAUTION
A drill may be used during disassembly only. Do not use a drill for reassembly. Using a drill
during assembly could cause damage to speed nuts.
Ensure SECM curbside rack assembly is moved uniformly to ensure curbside rack assembly
is not in a bind. Placing SECM curbside rack assembly in a bind could cause damage to
components of the SECM curbside rack assembly.
00111


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.