• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
MAINTENANCE INSTRUCTIONS FOR CABINET INTEGRATION HARDWARE - Continued
MAINTENANCE INSTRUCTIONS FOR EYEWASH STATION ASSEMBLY BRACKET AND HARDWARE

Aviation Maintenance Manual For Power Train Shop P/N 1036459 And P/N Sc492097Cla65
Page Navigation
  168    169    170    171    172  173  174    175    176    177    178  
img
. .
0041 00
TM 1-4920-438-13&P
INSTALLATION CONTINUED
CABINETS C AND D HARDWARE CONTINUED
2.  Install four bolts (Figure 2, Item 4), four lock washers (Figure 2, Item 5), and four lat washers (Figure 2, Item
6) securing two cabinet brackets (Figure 2, Item 3) to shelter loor.
Torque bolts (Figure 2, Item 4) 160-190 in. lbs.
3.
4.
Install slides, drawers, and shelves as necessary (WP 0040 00, Drawers, Slides, And Shelves,
INSTALLATION ).
5.
Install kick plate (WP 0040 00, Kick Plate, INSTALLATION ).
INSPECTION OF INSTALLED ITEMS
CABINET E, F AND G HARDWARE
Figure 3.
Cabinet E, F and G Hardware.
Inspect cabinet assembly integration hardware (Figure 3) for rust, cracks and rounded heads. Replace as nec-
essary.
REMOVAL
CABINET E, F AND G HARDWARE
Remove four bolts (Figure 3, Item 3), four lock washers (Figure 3, Item 4), and four lat washers (Figure 3, Item
5) detaching two cabinet brackets (Figure 3, Item 2) from shelter loor.
INSTALLATION
CABINET E, F AND G HARDWARE
1.
Install four bolts (Figure 3, Item 3), four lock washers (Figure 3, Item 4), and four lat washers (Figure 3, Item
5) securing two cabinet brackets (Figure 3, Item 2) to shelter loor.
Torque bolts (Figure 2, Item 4) 160-190 in. lbs.
2.
END OF WORK PACKAGE
0041 00-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.