MAINTENANCE INSTRUCTIONS FOR FIRST AID BRACKET ASSEMBLY AND HARDWARE - Continued
Figure 1. Testing ECU Power Cable.

Maintenance Manual For Production/ Quality Control Shop Part No. 1036659 And Part No. Sc4920-99-Cla66
Page Navigation
  178    179    180    181    182  183  184    185    186    187    188  
img
. . . . . .
TM 1-4920-440-13&P
0050 00
FIELD MAINTENANCE
PRODUCTION/QUALITY CONTROL SHOP
MAINTENANCE INSTRUCTIONS FOR ECU POWER CABLE ASSEMBLY
INITIAL SETUP:
Materials/Parts (cont.)
Tools and Special Tools
Electrical Repairers Tool Kit
(WP 0063 00, Table 2, Item 103 )
Twine, Fibrous (WP 0069 00, Item 9)
General Mechanics Tool Kit
Personnel Required
(WP 0063 00, Table 2, Item 104 )
CMF 15 Series (1)
Multimeter (WP 0063 00, Table 2, Item 106 )
Equipment Condition
Materials/Parts
Functional
Tape, Electrical (WP 0069 00, Item 8)
WARNING
HIGH VOLTAGE exists in electrical system of shop. All electrical inspections, repairs, or
replacements will be performed with power OFF and only by a qualiied electrician. Serious
shock hazards exist which could result in INJURY OR EVEN DEATH to personnel.
NOTE
During installation of components, same hardware should be used so as to maintain
original integrity of shop set.
If ECU (NSN 4120-01-523-4472) is being used, it may be necessary to change electrical
plug connector on end of ECU cables to electrical plug connector (NSN 5935-01-413-
4953) to ensure ECU power cable is compatible with ECU.
INSPECTION OF INSTALLED ITEMS
ECU POWER CABLE
Inspect ECU power cable connectors and ECU power cable for any type of damage.
0050 00-1